Outsourcing construction management method and system of power distribution network, electronic equipment and storage medium
The invention discloses an outsourcing construction management method and system of a power distribution network, electronic equipment and a storage medium, the power distribution network comprises a plurality of power distribution lines, and the outsourcing construction management method of the pow...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an outsourcing construction management method and system of a power distribution network, electronic equipment and a storage medium, the power distribution network comprises a plurality of power distribution lines, and the outsourcing construction management method of the power distribution network comprises the following steps: acquiring defect information of the power distribution network; according to the defect information, judging whether the power distribution network has a tree barrier defect and/or an equipment disabled defect; if yes, generating at least one outsourcing work plan list according to the tree barrier defect and/or the equipment disability defect; and after the feedback receipt of the outsourcing work plan list is obtained, determining the completion state of the outsourcing work plan list. According to the technical scheme, automatic generation and automatic acceptance of the outsourcing work plan list are realized, the defect processing efficiency and processing |
---|