Rapid comprehensive evaluation method for performance of tunnel hole slag for machine-made gravel
The invention discloses a method for rapidly and comprehensively evaluating the performance of tunnel hole slag for machine-made gravel, and particularly relates to the technical field of comprehensive evaluation of the performance of tunnel hole slag. And after the camera is connected with the netw...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a method for rapidly and comprehensively evaluating the performance of tunnel hole slag for machine-made gravel, and particularly relates to the technical field of comprehensive evaluation of the performance of tunnel hole slag. And after the camera is connected with the network, background personnel can check the moving position of sampling personnel through a background display screen, and the background personnel can communicate with the hole slag position of the user at any time to assist in taking the proper hole slag and can also see whether the hole slag selected by the user is natural air-dried hole slag or not. According to the method, operation errors, inconformity with detection standards and influence on the accuracy of detection evaluation during personnel test detection are avoided, once step errors exist, modification processing can be carried out in time, high-speed judgment processing is realized, inaccurate data caused by personnel misoperation is avoided, and efficie |
---|