Construction method for BRB buckling restrained brace connection

The invention discloses a construction method for BRB buckling restrained brace connection, and relates to the technical field of constructional engineering renovation. According to the adopted scheme, the construction method comprises the following steps that a brace is transported; temporarily fix...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG DAWEI, WANG DUIMAO, WANG XIN, WANG JUN, JIA BEI, SONG WU, ZHANG WENYA, YAN JIANBIN, CHEN YAHUI, WANG JUANJUAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for BRB buckling restrained brace connection, and relates to the technical field of constructional engineering renovation. According to the adopted scheme, the construction method comprises the following steps that a brace is transported; temporarily fixing the support; mounting and adjusting node hoops; supporting connection; detecting a connection node; anti-corrosion and fireproof coating; according to the method, a hooping method is adopted, the periphery of the dewatering well within the range from 2 m below the base to 1 m above the base can be filled with the water seepage filter material, the dewatering construction efficiency of underground water above the elevation can be improved through the measure, through the novel construction method, operation is easy, components can be produced in batches, labor is saved, and the cost is reduced; the position deviation of the steel structure BRB embedded connecting piece is solved, the construction period is short