Roof dust removal pipeline mounting structure of steelmaking continuous casting plant and using method of roof dust removal pipeline mounting structure

The invention relates to a steelmaking continuous casting plant roof dust removal pipeline installation structure which comprises a plurality of roof longitudinal beams, a plurality of roof cross beams, a plurality of pipe supports, a conveying support and a transverse pushing support. The roof cros...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HUANG YI, YU SHENGDONG, LU KUIZHONG, ZHANG YINFENG, NIU XINGGUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a steelmaking continuous casting plant roof dust removal pipeline installation structure which comprises a plurality of roof longitudinal beams, a plurality of roof cross beams, a plurality of pipe supports, a conveying support and a transverse pushing support. The roof cross beams are installed between every two adjacent roof longitudinal beams respectively, and the roof longitudinal beams and the roof cross beams are divided into a dust removal pipeline installation area and a dust removal pipeline grouping area; the pipe brackets are fixedly mounted on two adjacent roof longitudinal beams; the conveying support is fixedly installed on the outer side face of the pipe support on the outermost edge of a dust removal pipeline grouping area. The transverse pushing bracket is fixedly mounted on two adjacent pipe supports in a dust removal pipeline grouping area; the dust removal pipeline can be rapidly installed under the condition that the roof cross beam is installed, the situation tha