Roof dust removal pipeline mounting structure of steelmaking continuous casting plant and using method of roof dust removal pipeline mounting structure
The invention relates to a steelmaking continuous casting plant roof dust removal pipeline installation structure which comprises a plurality of roof longitudinal beams, a plurality of roof cross beams, a plurality of pipe supports, a conveying support and a transverse pushing support. The roof cros...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a steelmaking continuous casting plant roof dust removal pipeline installation structure which comprises a plurality of roof longitudinal beams, a plurality of roof cross beams, a plurality of pipe supports, a conveying support and a transverse pushing support. The roof cross beams are installed between every two adjacent roof longitudinal beams respectively, and the roof longitudinal beams and the roof cross beams are divided into a dust removal pipeline installation area and a dust removal pipeline grouping area; the pipe brackets are fixedly mounted on two adjacent roof longitudinal beams; the conveying support is fixedly installed on the outer side face of the pipe support on the outermost edge of a dust removal pipeline grouping area. The transverse pushing bracket is fixedly mounted on two adjacent pipe supports in a dust removal pipeline grouping area; the dust removal pipeline can be rapidly installed under the condition that the roof cross beam is installed, the situation tha |
---|