Method and system for measuring construction quota consumption of power grid uninterruptible power operation project

The invention discloses a power grid non-power-cut operation project construction quota consumption measuring method and system, and belongs to the technical field of power distribution network non-power-cut operation project construction. Existing project construction quota consumption measurement...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YU MIN, LIU FUYAN, YING QI, LIU JINGHUA, LIU QIANG, YANG XIAOYONG, DONG SHIBO, LIU CUILIU, YAN WEI, LU YU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a power grid non-power-cut operation project construction quota consumption measuring method and system, and belongs to the technical field of power distribution network non-power-cut operation project construction. Existing project construction quota consumption measurement is not comprehensive enough, the final measurement result is affected, and application and popularization are not facilitated. According to the power distribution network non-power-outage operation project construction quota consumption measuring method, a non-power-outage working model, a non-power-outage operation model, a non-power-outage duration model and a non-power-outage consumption model are constructed and used for calculating the consumption of manpower, materials and mechanical equipment needed by power distribution network non-power-outage operation. The measured consumption data is more comprehensive, scientific and accurate, meanwhile, the construction efficiency can be improved, manpower is saved, m