Installation method of high tower turbulent flow device
The invention discloses an installation method of a high tower turbulent flow device, a tower drum is included, a first through hole is formed in the outer side wall of the upper end of the tower drum, a second through hole is formed in the outer side wall of the lower end of the tower drum, and the...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an installation method of a high tower turbulent flow device, a tower drum is included, a first through hole is formed in the outer side wall of the upper end of the tower drum, a second through hole is formed in the outer side wall of the lower end of the tower drum, and the installation method specifically comprises the steps that one end tail of a turbulent flow assembly is fixed in the first through hole; the tower drum is lifted and turned over; the other end of the turbulent flow assembly is pulled and wound along the peripheral wall of the tower drum at the same time; and the other end of the turbulent flow assembly is fixed in the second through hole. The mounting method is safe and reliable, and meanwhile, the mounting and dismounting cost of the turbulent flow assembly is reduced.
本申请公开了一种高塔扰流装置的安装方法,包括塔筒,所述塔筒的上端外侧壁设置有第一通孔,以及所述塔筒的下端外侧壁设置有第二通孔,所述安装方法具体为:将扰流组件的一端末固定于所述第一通孔内;将所述塔筒起吊翻身;将所述扰流组件的另一端拉住,同时沿所述塔筒的外周壁进行缠绕;将所述扰流组件的另一端末固定于所述第二通孔内。安装方法不仅安全可靠,同时降低扰流组件的安装与拆卸成本。 |
---|