Intelligent control method for positioning and sinking of deepwater prefabricated foundation of large bridge

The invention discloses an intelligent control method for positioning and sinking of a large-scale bridge deepwater prefabricated foundation, the upper part of the prefabricated foundation is above the water surface, the lower part of the prefabricated foundation is below the water surface, I positi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN SHANGYOU, WANG KUNPENG, WEN JIANIAN, ZHANG XIAOYU, LIU GAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an intelligent control method for positioning and sinking of a large-scale bridge deepwater prefabricated foundation, the upper part of the prefabricated foundation is above the water surface, the lower part of the prefabricated foundation is below the water surface, I positioning devices are mounted on the top surface, J positioning ships are arranged around the prefabricated foundation, I is a natural number greater than or equal to 3, J is a natural number greater than or equal to 4, and J is a natural number greater than or equal to 4. According to the method, the motion equation of the sinking process of the prefabricated foundation under the coupling action of wind, waves and flow is utilized, and the motion posture of the prefabricated foundation is intelligently regulated and controlled by an intelligent regulation and control center through the mooring cables. According to the method, the motion equation of the sinking process of the prefabricated foundation under the coupling