Power-up hot oil circulation method before converter transformer insulation test

The invention relates to a power-up hot oil circulation method before a converter transformer insulation test, and belongs to the technical field of transformer tests. According to the technical scheme, after the converter transformer is installed, in the transformer oil circulation process, a trans...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG GUANJUN, XU DAN, ZHAO ZONGJIE, TAO LILI, HAN BIN, SONG ZENGWANG, LI YONG, YU YANG, HE QING, JIA BOSHUAI, DU WEIJIE, LOU SHANSHAN, ZHAO FANG, ZHOU AIDONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a power-up hot oil circulation method before a converter transformer insulation test, and belongs to the technical field of transformer tests. According to the technical scheme, after the converter transformer is installed, in the transformer oil circulation process, a transformer body is electrically heated; the speed of oil passing through the coil of the converter transformer is increased through electric heating, particles, water and gas of the coil and the coil oil duct are taken away, and meanwhile the speed of transformer oil soaking of an insulating part in the converter transformer is increased. The method has the beneficial effects that moisture, gas and impurities in the converter transformer body and oil are effectively removed by adopting a power-on hot oil circulation mode, and meanwhile, insulation oil permeation is accelerated, so that the internal insulation strength of the converter transformer is improved. 本发明涉及一种换流变绝缘试验前的加电热油循环方法,属于变压器试验技术领域。技术方案是:换流变压器安装完成后,变压器油循环