Fishpond section roadbed and soft foundation treatment construction method thereof

The invention discloses a fishpond section roadbed and a soft foundation treatment construction method thereof, and relates to the technical field of constructional engineering. Comprising the following steps: S1, draining accumulated water in a to-be-treated construction area, and forming a non-soa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG JIANGHONG, YAN HUATANG, YANG YINGDONG, HONG HUARUI, DAI XIANGUO, JING JIACHI, ZHONG SHAOMIN, ZHANG XIMING, ZHANG GUANGHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a fishpond section roadbed and a soft foundation treatment construction method thereof, and relates to the technical field of constructional engineering. Comprising the following steps: S1, draining accumulated water in a to-be-treated construction area, and forming a non-soaking soft soil layer and a soaking soft soil layer in the construction area; s2, in-situ curing treatment is conducted on the non-water-soaking soft soil layer, and a first curing layer is formed; s3, in-situ curing treatment is conducted on the soaked soft soil layer to form a second curing layer, then roadbed filler is laid on the surface of the second curing layer till the roadbed filler is flush with the first curing layer, and a filler layer is formed; and S4, filling soil on the surfaces of the first curing layer and the filler layer to form a fishpond section roadbed. The non-water-soaked soft soil layer and the water-soaked soft soil layer are respectively treated based on the in-situ curing treatment techn