Construction process for pouring underwater concrete
The invention discloses a construction process for pouring underwater concrete, which belongs to the technical field of pile foundations, and comprises the following steps: step 1, pouring the underwater concrete by adopting a vertical lifting guide pipe method, before a guide pipe is used, carrying...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction process for pouring underwater concrete, which belongs to the technical field of pile foundations, and comprises the following steps: step 1, pouring the underwater concrete by adopting a vertical lifting guide pipe method, before a guide pipe is used, carrying out a lengthening airtight test, manufacturing a guide pipe support frame by using profile steel, supporting the support frame on a drilling platform for supporting and suspending the guide pipe, 2, underwater concrete construction is conducted, concrete mixing is conducted in a unified mode through a mixing station, and concrete is transported through a tank car and poured in cooperation with a guide pipe. According to the construction technology for pouring the underwater concrete, guide pipe concrete pouring can be completed underwater, a poured pile foundation has good structural strength, foaming control is good, the integrity of the pile foundation is high, and the problems that underwater impurities and gra |
---|