Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall

The invention discloses a near subway deep foundation pit main body structure early connection and mid-partition wall early removal process. The process comprises the steps that underground structure construction is conducted layer by layer in a foundation pit from bottom to top; when construction o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DUAN TAO, LI CHAO, GUO LEI, QING CHANGJIANG, ZHANG FENG, YANG ZUNLIN, JIN GUODONG, ZHANG KUN, XU YONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DUAN TAO
LI CHAO
GUO LEI
QING CHANGJIANG
ZHANG FENG
YANG ZUNLIN
JIN GUODONG
ZHANG KUN
XU YONG
description The invention discloses a near subway deep foundation pit main body structure early connection and mid-partition wall early removal process. The process comprises the steps that underground structure construction is conducted layer by layer in a foundation pit from bottom to top; when construction of a foundation slab of the foundation pit is completed and the design strength is achieved, the middle partition wall of the underground structure of the bottommost layer is dismantled, a plurality of columns are reserved in the middle partition wall at the dismantled part at certain intervals, the middle partition wall below a construction trestle area is not dismantled, holing is conducted only at the position of a structural beam, and a support replacement belt is constructed; the beam plates of the middle partition wall cut-off areas of every two adjacent foundation pits are connected in a penetrating mode, structural beam penetrating is conducted on the middle partition wall areas which are not dismantled unde
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN116122298A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN116122298A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN116122298A3</originalsourceid><addsrcrecordid>eNqNjMEKwjAQRHvxIOo_rB_QQyuIHqUonsSD97JNthBINiGbUHry1w2lH-Bphpk3s62-7-gVicDoIxBGO4PyzKSS8Qx-BC4hSB4mnEEThQJm1rjUwSRwaBgGr2eQFLNKORIg6_VLG0ERckPx5cwZXQeMySzzCa3dV5sRrdBh1V11fNw_3bOm4HuSgIqYUt-9mubctG17vdxO_zA_HHJJSw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall</title><source>esp@cenet</source><creator>DUAN TAO ; LI CHAO ; GUO LEI ; QING CHANGJIANG ; ZHANG FENG ; YANG ZUNLIN ; JIN GUODONG ; ZHANG KUN ; XU YONG</creator><creatorcontrib>DUAN TAO ; LI CHAO ; GUO LEI ; QING CHANGJIANG ; ZHANG FENG ; YANG ZUNLIN ; JIN GUODONG ; ZHANG KUN ; XU YONG</creatorcontrib><description>The invention discloses a near subway deep foundation pit main body structure early connection and mid-partition wall early removal process. The process comprises the steps that underground structure construction is conducted layer by layer in a foundation pit from bottom to top; when construction of a foundation slab of the foundation pit is completed and the design strength is achieved, the middle partition wall of the underground structure of the bottommost layer is dismantled, a plurality of columns are reserved in the middle partition wall at the dismantled part at certain intervals, the middle partition wall below a construction trestle area is not dismantled, holing is conducted only at the position of a structural beam, and a support replacement belt is constructed; the beam plates of the middle partition wall cut-off areas of every two adjacent foundation pits are connected in a penetrating mode, structural beam penetrating is conducted on the middle partition wall areas which are not dismantled unde</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230516&amp;DB=EPODOC&amp;CC=CN&amp;NR=116122298A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230516&amp;DB=EPODOC&amp;CC=CN&amp;NR=116122298A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DUAN TAO</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>GUO LEI</creatorcontrib><creatorcontrib>QING CHANGJIANG</creatorcontrib><creatorcontrib>ZHANG FENG</creatorcontrib><creatorcontrib>YANG ZUNLIN</creatorcontrib><creatorcontrib>JIN GUODONG</creatorcontrib><creatorcontrib>ZHANG KUN</creatorcontrib><creatorcontrib>XU YONG</creatorcontrib><title>Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall</title><description>The invention discloses a near subway deep foundation pit main body structure early connection and mid-partition wall early removal process. The process comprises the steps that underground structure construction is conducted layer by layer in a foundation pit from bottom to top; when construction of a foundation slab of the foundation pit is completed and the design strength is achieved, the middle partition wall of the underground structure of the bottommost layer is dismantled, a plurality of columns are reserved in the middle partition wall at the dismantled part at certain intervals, the middle partition wall below a construction trestle area is not dismantled, holing is conducted only at the position of a structural beam, and a support replacement belt is constructed; the beam plates of the middle partition wall cut-off areas of every two adjacent foundation pits are connected in a penetrating mode, structural beam penetrating is conducted on the middle partition wall areas which are not dismantled unde</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMEKwjAQRHvxIOo_rB_QQyuIHqUonsSD97JNthBINiGbUHry1w2lH-Bphpk3s62-7-gVicDoIxBGO4PyzKSS8Qx-BC4hSB4mnEEThQJm1rjUwSRwaBgGr2eQFLNKORIg6_VLG0ERckPx5cwZXQeMySzzCa3dV5sRrdBh1V11fNw_3bOm4HuSgIqYUt-9mubctG17vdxO_zA_HHJJSw</recordid><startdate>20230516</startdate><enddate>20230516</enddate><creator>DUAN TAO</creator><creator>LI CHAO</creator><creator>GUO LEI</creator><creator>QING CHANGJIANG</creator><creator>ZHANG FENG</creator><creator>YANG ZUNLIN</creator><creator>JIN GUODONG</creator><creator>ZHANG KUN</creator><creator>XU YONG</creator><scope>EVB</scope></search><sort><creationdate>20230516</creationdate><title>Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall</title><author>DUAN TAO ; LI CHAO ; GUO LEI ; QING CHANGJIANG ; ZHANG FENG ; YANG ZUNLIN ; JIN GUODONG ; ZHANG KUN ; XU YONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN116122298A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>DUAN TAO</creatorcontrib><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>GUO LEI</creatorcontrib><creatorcontrib>QING CHANGJIANG</creatorcontrib><creatorcontrib>ZHANG FENG</creatorcontrib><creatorcontrib>YANG ZUNLIN</creatorcontrib><creatorcontrib>JIN GUODONG</creatorcontrib><creatorcontrib>ZHANG KUN</creatorcontrib><creatorcontrib>XU YONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DUAN TAO</au><au>LI CHAO</au><au>GUO LEI</au><au>QING CHANGJIANG</au><au>ZHANG FENG</au><au>YANG ZUNLIN</au><au>JIN GUODONG</au><au>ZHANG KUN</au><au>XU YONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall</title><date>2023-05-16</date><risdate>2023</risdate><abstract>The invention discloses a near subway deep foundation pit main body structure early connection and mid-partition wall early removal process. The process comprises the steps that underground structure construction is conducted layer by layer in a foundation pit from bottom to top; when construction of a foundation slab of the foundation pit is completed and the design strength is achieved, the middle partition wall of the underground structure of the bottommost layer is dismantled, a plurality of columns are reserved in the middle partition wall at the dismantled part at certain intervals, the middle partition wall below a construction trestle area is not dismantled, holing is conducted only at the position of a structural beam, and a support replacement belt is constructed; the beam plates of the middle partition wall cut-off areas of every two adjacent foundation pits are connected in a penetrating mode, structural beam penetrating is conducted on the middle partition wall areas which are not dismantled unde</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN116122298A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Process for early connection of near subway deep foundation pit main body structure and early disassembly of mid-partition wall
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T12%3A36%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DUAN%20TAO&rft.date=2023-05-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN116122298A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true