Bridge abutment lifting construction method for reconstruction and extension of expressway

The invention discloses a bridge abutment lifting construction method for highway reconstruction and extension. The method comprises the following steps that supporting and protecting walls are driven into middle separation belts of a highway respectively, and then half old roadbeds are excavated to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SUN BIAN, SUO WENMING, WANG PENG, SU WEILIN, YAO JUAN, LIU CHUNYAN, PENG JIANFANG, LI HONGJUN, FAN XIAOPEI, NI ZHOUJIE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a bridge abutment lifting construction method for highway reconstruction and extension. The method comprises the following steps that supporting and protecting walls are driven into middle separation belts of a highway respectively, and then half old roadbeds are excavated to the bottom faces of the roadbeds respectively; (2) construction of a plurality of drilled piles, a half new bearing platform, a plurality of bearing platform bodies, a cap beam, a back wall and a lug wall is completed in sequence, earthwork filling and connecting beam plate erecting are completed, and normal traffic of a reconstructed half pavement is achieved firstly, and (3) lifting reconstruction construction of the other half new bearing platform is completed. According to the method, the problem that the other half of the new bearing platform cannot continue to be communicated when the half of the new bearing platform is lifted for construction is solved, meanwhile, it is guaranteed that when the half of the