Comprehensive energy base optimal configuration method based on annual time sequence production simulation
The invention relates to a comprehensive energy base optimal configuration method based on annual time sequence production simulation, and the method comprises the steps: 1, building a unit output and unit state model which comprises a wind power system output model, a photovoltaic system output mod...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a comprehensive energy base optimal configuration method based on annual time sequence production simulation, and the method comprises the steps: 1, building a unit output and unit state model which comprises a wind power system output model, a photovoltaic system output model, a thermal power unit operation state model, and an energy storage system charging and discharging model; 2, establishing a system economy optimization target, and converting the whole life cycle cost including the investment cost and the operation and maintenance cost into the annual average capacity cost; setting output constraint conditions including system reliability constraint, delivery channel power constraint, thermal power generating unit output constraint, thermal power generating unit climbing constraint, energy storage system capacity constraint and energy storage system charging and discharging power constraint; and step 4, solving and calculating. According to the method, support can be provided fo |
---|