Construction method for positioning and mounting super-long screw

The invention discloses a construction method for positioning and installing a super-long screw rod, the super-long screw rod is fixed in a square sleeve through grouting, the super-long screw rod comprises an upper screw rod, a connector and a lower screw rod which are in threaded connection in seq...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YIN QIJIA, CHEN JINGRU, LIU YOUWEI, LIU JIAN, ZHANG NING, LUO LIHONG, ZHOU YONG, LUO BIN, WU YINGYE, WU YANBIN, DENG ZHENGWEN, WANG LEI, LYU MAOFENG, HU CHENG, ZHANG BIN, FU YE, YAO YUANSHUI, HE SASA, XU WEN, ZHU JIEBING, XING HAO, ZHAO YONG, LI DONGHAI, ZHOU WEIKANG, ZHANG SHUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for positioning and installing a super-long screw rod, the super-long screw rod is fixed in a square sleeve through grouting, the super-long screw rod comprises an upper screw rod, a connector and a lower screw rod which are in threaded connection in sequence, a steel plate is arranged on the upper screw rod in a penetrating mode, and the construction method comprises the following steps: S1, measuring and setting out a grouting material range control point, and manually snapping a line; chiseling all concrete surfaces in the grouting range, and cleaning; s2, the pipe wall of the square steel pipe is cleaned, and an adhesion agent is brushed on the concrete surface within the grouting range; s3, the super-long screw is placed in the square sleeve, and the super-long screw is fixed through a tool; s4, the elevation and flatness of the tool and the elevation of the steel plate are adjusted, and the positions of the upper screws are finely adjusted one by one through