Rock-fill dam monitoring system based on gravelly soil core wall for water conservancy project and construction method
The invention discloses a rock-fill dam monitoring system based on a gravelly soil core wall for a water conservancy project and a construction method, and relates to the technical field of water conservancy project construction, the rock-fill dam monitoring system comprises a data acquisition and p...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a rock-fill dam monitoring system based on a gravelly soil core wall for a water conservancy project and a construction method, and relates to the technical field of water conservancy project construction, the rock-fill dam monitoring system comprises a data acquisition and processing terminal, and the construction method comprises the following steps: a control terminal connected with the data acquisition and processing terminal is used for acquiring a construction target task; the construction content and the construction duration are analyzed; analyzing climatic change and landform characteristics of the task attribution within the construction time limit; construction target task construction configuration is designed by referring to climate changes and landform characteristics in the construction time limit; a construction scheme is confirmed, construction machinery configuration content in the construction scheme is extracted, various configurations of construction machinery are |
---|