Tunnel inclined shaft vehicle avoiding hole and water collecting bin integrated construction method and tunnel inclined shaft structure

The invention discloses a tunnel inclined shaft vehicle avoiding hole and water collecting bin integrated construction method and a tunnel inclined shaft structure. The method comprises the following steps that S1, in the tunnel inclined shaft construction process, a vehicle avoiding hole is excavat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TAO MING, CHANG CHUNHUI, WANG JINGHUA, CHEN QIANG, BAI SHANGBEN, WU QIHANG, LI YAO, WANG RUNZE, TIAN WANLIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a tunnel inclined shaft vehicle avoiding hole and water collecting bin integrated construction method and a tunnel inclined shaft structure. The method comprises the following steps that S1, in the tunnel inclined shaft construction process, a vehicle avoiding hole is excavated in the side portion of a tunnel inclined shaft, supporting is conducted while excavation is conducted, a water collecting bin is excavated at the tail end of the vehicle avoiding hole, and meanwhile a water pumping structure is arranged on one side of the water collecting bin; and S2, according to the construction progress of the tunnel inclined shaft, a plurality of vehicle avoiding holes and water collecting bins are sequentially excavated according to the method in the step S1. In the tunnel inclined shaft construction process, the mode of integrated construction of the vehicle avoiding hole and the water collecting bin is adopted, one-time excavation and supporting of the vehicle avoiding hole are achieved,