Method and device for correcting abnormal working hours of construction hoist

The invention provides a method and a device for correcting abnormal working hours of a construction hoist. The method comprises the following steps: acquiring a working condition data queue and a working hour statistical queue of the construction hoist; if the accumulated working time length of the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO HUI, JIANG LIPING, ZHANG QILIANG, TANG BO, WANG FEI, MA WENSI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a method and a device for correcting abnormal working hours of a construction hoist. The method comprises the following steps: acquiring a working condition data queue and a working hour statistical queue of the construction hoist; if the accumulated working time length of the tail of the working hour statistical queue is greater than the time difference between the real-time working time of the tail of the working condition data queue and the real-time working time of the head of the working condition data queue, determining that the accumulated working time length in the working hour statistical queue is abnormal; dequeuing operation is repeatedly executed on the man-hour statistical queue and the working condition data queue, and whether the current dequeuing accumulated working time of the man-hour statistical queue is abnormal or not is determined based on the current dequeuing accumulated working time of the man-hour statistical queue and the current dequeuing real-time working ti