Method and device for correcting abnormal working hours of construction hoist
The invention provides a method and a device for correcting abnormal working hours of a construction hoist. The method comprises the following steps: acquiring a working condition data queue and a working hour statistical queue of the construction hoist; if the accumulated working time length of the...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a method and a device for correcting abnormal working hours of a construction hoist. The method comprises the following steps: acquiring a working condition data queue and a working hour statistical queue of the construction hoist; if the accumulated working time length of the tail of the working hour statistical queue is greater than the time difference between the real-time working time of the tail of the working condition data queue and the real-time working time of the head of the working condition data queue, determining that the accumulated working time length in the working hour statistical queue is abnormal; dequeuing operation is repeatedly executed on the man-hour statistical queue and the working condition data queue, and whether the current dequeuing accumulated working time of the man-hour statistical queue is abnormal or not is determined based on the current dequeuing accumulated working time of the man-hour statistical queue and the current dequeuing real-time working ti |
---|