Power transmission maintenance plan generation method and device, equipment and storage medium
The invention discloses a power transmission maintenance plan generation method and device, equipment and a storage medium. The method comprises the following steps: constructing an equipment state coupling association relationship based on maintenance and N-1 faults; constructing a superior schedul...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a power transmission maintenance plan generation method and device, equipment and a storage medium. The method comprises the following steps: constructing an equipment state coupling association relationship based on maintenance and N-1 faults; constructing a superior scheduling maintenance plan-unit commitment joint optimization model by taking the lowest total maintenance cost as a target; solving the superior scheduling maintenance plan-unit commitment joint optimization model to obtain a superior scheduling maintenance plan; constructing a regional dispatching maintenance plan-unit commitment joint optimization model by taking the lowest total maintenance cost as a target; according to the embodiment of the invention, the situation that the node power cannot be balanced after the N-1 fault occurs in the model can be avoided, the solvability of the model is ensured, and a superior and subordinate scheduling coordination method of partition standby and maintenance is considered, so t |
---|