New cell topology acceptance device and method

The invention discloses a newly-built cell topology acceptance device and method. The newly-built cell topology acceptance device comprises a handheld terminal, a management terminal and a monitoring master station. During new cell topology acceptance, the handheld terminal is used for photographing...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG MEI, TANG JUN, MA JUNDA, CAO YIXIN, ZHU BINQUAN, ZHAO JIANFEI, SHENG DONG, ZHONG DINGDANG, LOU GANG, WEI LEXIN, WANG KE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a newly-built cell topology acceptance device and method. The newly-built cell topology acceptance device comprises a handheld terminal, a management terminal and a monitoring master station. During new cell topology acceptance, the handheld terminal is used for photographing and information input of switches at all levels, informing a user of operations such as switching on and switching off and uploading switching on and switching off time to the monitoring master station, and the management terminal is used for performing ammeter reading and power failure event analysis according to an instruction issued by the monitoring master station and uploading an ammeter set according to the instruction of the monitoring master station. And the monitoring master station is used for receiving information of the handheld terminal and the management terminal, issuing a corresponding instruction, reading a corresponding ammeter set at the management terminal according to an ammeter switching-on s