Pipe laying machine with forward traction winch configuration
A pipe laying machine may include a machine chassis; a traction winch assembly coupled to the machine chassis; an operator cab supported by the machine chassis; the engine is supported by the machine chassis; and a boom coupled to the machine chassis. The pipelaying machine may include a forward por...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A pipe laying machine may include a machine chassis; a traction winch assembly coupled to the machine chassis; an operator cab supported by the machine chassis; the engine is supported by the machine chassis; and a boom coupled to the machine chassis. The pipelaying machine may include a forward portion and a rearward portion. The traction winch assembly may be disposed at a forward portion of the pipe laying machine. An operator cab may be disposed between the traction winch assembly and the engine.
一种铺管机,其可以包括机器底盘;牵引绞车组件,其联接到所述机器底盘;操作员驾驶室,其由所述机器底盘支撑;发动机,其由所述机器底盘支撑;以及吊杆,其联接到所述机器底盘。铺管机可包括前部部分和后部部分。牵引绞车组件可以设置在铺管机的前部部分。操作员驾驶室可设置在牵引绞车组件和发动机之间。 |
---|