Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method

The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN HUASHEN, XIA QIDONG, LIANG ZHIFENG, LIAO ZHIJIAN, ZHANG FENGYU, ZAN SHUAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CHEN HUASHEN
XIA QIDONG
LIANG ZHIFENG
LIAO ZHIJIAN
ZHANG FENGYU
ZAN SHUAI
description The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom plate cushion layer is excavated and built, and a main blind pipe is manufactured and placed; s30, the periphery of the blind pipe is wrapped and backfilled with a gravel permeable layer; s40, sand-lime bricks are laid on the two sides of the post-cast strip in a masonry mode, and variable-section connectors are installed so that the PVC50 blind pipes can be communicated with the PVC110 main blind pipes at the bottoms of the grooves; s50, the PVC blind pipe is wrapped with multiple layers of geotechnical cloth; and S60, after the strength of the cushion layer meets the requirement, construction of a waterproof layer, a protective layer and other working procedures is conducted. The method has the beneficial effects
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115897759A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115897759A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115897759A3</originalsourceid><addsrcrecordid>eNqNjDEKwkAQRdNYiHqH8QApgoRoKVGxsrIP6-5EFzY7484sktsb1ANYPfi8_-bF84DI0FOOzqinCOwVbqRKA3AwisAkWlojCqLJM7hkfDR3BBMdvCYjgWTmMIL1yebwzcgoigNYitMr2882oD7ILYtZb4Lg6sdFsT4dr-25RKYOhY3FiNq1l6qqt7umqXf7zT_OGxvLROk</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method</title><source>esp@cenet</source><creator>CHEN HUASHEN ; XIA QIDONG ; LIANG ZHIFENG ; LIAO ZHIJIAN ; ZHANG FENGYU ; ZAN SHUAI</creator><creatorcontrib>CHEN HUASHEN ; XIA QIDONG ; LIANG ZHIFENG ; LIAO ZHIJIAN ; ZHANG FENGYU ; ZAN SHUAI</creatorcontrib><description>The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom plate cushion layer is excavated and built, and a main blind pipe is manufactured and placed; s30, the periphery of the blind pipe is wrapped and backfilled with a gravel permeable layer; s40, sand-lime bricks are laid on the two sides of the post-cast strip in a masonry mode, and variable-section connectors are installed so that the PVC50 blind pipes can be communicated with the PVC110 main blind pipes at the bottoms of the grooves; s50, the PVC blind pipe is wrapped with multiple layers of geotechnical cloth; and S60, after the strength of the cushion layer meets the requirement, construction of a waterproof layer, a protective layer and other working procedures is conducted. The method has the beneficial effects</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230404&amp;DB=EPODOC&amp;CC=CN&amp;NR=115897759A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230404&amp;DB=EPODOC&amp;CC=CN&amp;NR=115897759A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN HUASHEN</creatorcontrib><creatorcontrib>XIA QIDONG</creatorcontrib><creatorcontrib>LIANG ZHIFENG</creatorcontrib><creatorcontrib>LIAO ZHIJIAN</creatorcontrib><creatorcontrib>ZHANG FENGYU</creatorcontrib><creatorcontrib>ZAN SHUAI</creatorcontrib><title>Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method</title><description>The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom plate cushion layer is excavated and built, and a main blind pipe is manufactured and placed; s30, the periphery of the blind pipe is wrapped and backfilled with a gravel permeable layer; s40, sand-lime bricks are laid on the two sides of the post-cast strip in a masonry mode, and variable-section connectors are installed so that the PVC50 blind pipes can be communicated with the PVC110 main blind pipes at the bottoms of the grooves; s50, the PVC blind pipe is wrapped with multiple layers of geotechnical cloth; and S60, after the strength of the cushion layer meets the requirement, construction of a waterproof layer, a protective layer and other working procedures is conducted. The method has the beneficial effects</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjDEKwkAQRdNYiHqH8QApgoRoKVGxsrIP6-5EFzY7484sktsb1ANYPfi8_-bF84DI0FOOzqinCOwVbqRKA3AwisAkWlojCqLJM7hkfDR3BBMdvCYjgWTmMIL1yebwzcgoigNYitMr2882oD7ILYtZb4Lg6sdFsT4dr-25RKYOhY3FiNq1l6qqt7umqXf7zT_OGxvLROk</recordid><startdate>20230404</startdate><enddate>20230404</enddate><creator>CHEN HUASHEN</creator><creator>XIA QIDONG</creator><creator>LIANG ZHIFENG</creator><creator>LIAO ZHIJIAN</creator><creator>ZHANG FENGYU</creator><creator>ZAN SHUAI</creator><scope>EVB</scope></search><sort><creationdate>20230404</creationdate><title>Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method</title><author>CHEN HUASHEN ; XIA QIDONG ; LIANG ZHIFENG ; LIAO ZHIJIAN ; ZHANG FENGYU ; ZAN SHUAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115897759A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN HUASHEN</creatorcontrib><creatorcontrib>XIA QIDONG</creatorcontrib><creatorcontrib>LIANG ZHIFENG</creatorcontrib><creatorcontrib>LIAO ZHIJIAN</creatorcontrib><creatorcontrib>ZHANG FENGYU</creatorcontrib><creatorcontrib>ZAN SHUAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN HUASHEN</au><au>XIA QIDONG</au><au>LIANG ZHIFENG</au><au>LIAO ZHIJIAN</au><au>ZHANG FENGYU</au><au>ZAN SHUAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method</title><date>2023-04-04</date><risdate>2023</risdate><abstract>The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom plate cushion layer is excavated and built, and a main blind pipe is manufactured and placed; s30, the periphery of the blind pipe is wrapped and backfilled with a gravel permeable layer; s40, sand-lime bricks are laid on the two sides of the post-cast strip in a masonry mode, and variable-section connectors are installed so that the PVC50 blind pipes can be communicated with the PVC110 main blind pipes at the bottoms of the grooves; s50, the PVC blind pipe is wrapped with multiple layers of geotechnical cloth; and S60, after the strength of the cushion layer meets the requirement, construction of a waterproof layer, a protective layer and other working procedures is conducted. The method has the beneficial effects</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN115897759A
source esp@cenet
subjects CESSPOOLS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SEWERAGE
SEWERS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
WATER SUPPLY
title Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T12%3A52%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20HUASHEN&rft.date=2023-04-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115897759A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true