Deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method
The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom p...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a deep foundation pit bottom plate post-cast strip drainage and water supply circulation system construction method. The method comprises the following steps that S10, construction preparation and measurement are conducted; s20, a groove below a post-cast strip and a bottom plate cushion layer is excavated and built, and a main blind pipe is manufactured and placed; s30, the periphery of the blind pipe is wrapped and backfilled with a gravel permeable layer; s40, sand-lime bricks are laid on the two sides of the post-cast strip in a masonry mode, and variable-section connectors are installed so that the PVC50 blind pipes can be communicated with the PVC110 main blind pipes at the bottoms of the grooves; s50, the PVC blind pipe is wrapped with multiple layers of geotechnical cloth; and S60, after the strength of the cushion layer meets the requirement, construction of a waterproof layer, a protective layer and other working procedures is conducted. The method has the beneficial effects |
---|