Material distribution path optimization method for digital twin-driven mixed-flow assembly workshop
The invention discloses a material distribution path optimization method for a digital twin-driven mixed-flow assembly workshop, and the method comprises the steps: 1, monitoring the material change of assembly nodes in the mixed-flow assembly workshop and the change of obstacles between the nodes t...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a material distribution path optimization method for a digital twin-driven mixed-flow assembly workshop, and the method comprises the steps: 1, monitoring the material change of assembly nodes in the mixed-flow assembly workshop and the change of obstacles between the nodes through a digital twin system, and providing the material demand information of the assembly nodes and the state information of the obstacles in real time; 2, according to different product assembly task requirements, an improved artificial fish swarm algorithm is used for planning an optimal distribution sequence of required material nodes for assembly nodes of required materials in different time periods; and 3, counting and updating obstacle information between the assembly nodes, and optimizing a local path between the assembly nodes on line by using an artificial potential field method. According to the method, the mixed flow assembly workshop is monitored in real time and information is obtained through the di |
---|