Method and device for calculating production scheduling scheme of warping preparation workshop
The invention discloses a calculation method and device for a production scheduling scheme of a warping preparation workshop, and belongs to the technical field of weaving, and the calculation method for the production scheduling scheme of the warping preparation workshop comprises the steps: buildi...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a calculation method and device for a production scheduling scheme of a warping preparation workshop, and belongs to the technical field of weaving, and the calculation method for the production scheduling scheme of the warping preparation workshop comprises the steps: building a production scheduling model of the warping preparation workshop based on a target constraint condition and a penalty function, the workshop production scheduling model is prepared for calculating the beam opening number of the warping beam and the total warping processing time, and the target constraint conditions comprise a total warp number constraint condition, an order meter number constraint condition, a cylinder splicing constraint condition, a warping beam winding length constraint condition and a warping beam winding number constraint condition; and establishing a self-adaptive simulated annealing algorithm based on a simulated annealing algorithm and the self-adaptive annealing factor, and calculating |
---|