Construction method for actively controlling deformation of buildings and structures through multi-row grouting

The invention discloses a construction method for actively controlling deformation of buildings and structures through multi-row grouting. The construction method comprises the following steps that the number and positions of multi-row grouting holes located between the buildings and structures to b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HAN SHENGZHANG, HE ZHANJIANG, WANG LEI, YU QUANSHENG, LIANG ANPING, ZHANG TAN, GUO HUAJUN, FAN ZHANHAI, RAO YANG, LIU YING, QI KELU, ZHENG GANG, XIA ZENGYIN, JI YETAO, DU KUNPENG, MA XIAOLONG, MI TONGNIAN, ZHAO GANGLING, WANG GANG, WANG ZHENFEI, MENG LINGBO, LI XIANJUN, XING JINCHAO, CHENG XUESONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for actively controlling deformation of buildings and structures through multi-row grouting. The construction method comprises the following steps that the number and positions of multi-row grouting holes located between the buildings and structures to be corrected and a foundation pit and the range of grouting expansion areas in the grouting holes are obtained through theoretical calculation or numerical simulation calculation; grouting pipes are prepared, each grouting pipe is composed of a pipe A and a pipe B which are bound together, the axes of the pipe A and the pipe B are parallel, the top faces of the pipe A and the pipe B are flush, the length of the pipe B is larger than that of the pipe A, and the area between the bottom wall of the pipe B and the bottom wall of the pipe A is a grouting expansion area; grouting holes are drilled through a drilling machine according to the preset positions; a foundation pit is excavated on the inner side of an undergroun