Closed-loop road network phase difference optimization method based on improved cut-off method
The invention discloses a closed-loop road network phase difference optimization method based on an improved cut-off method, and belongs to the technical field of traffic signal control. The method is characterized by comprising the following steps: S1, establishing a closed-loop road network connec...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a closed-loop road network phase difference optimization method based on an improved cut-off method, and belongs to the technical field of traffic signal control. The method is characterized by comprising the following steps: S1, establishing a closed-loop road network connection priority level discrimination model based on fuzzy comprehensive evaluation, and determining a key intersection; s2, establishing a closed-loop road network phase difference optimization model based on an improved cut-off method; s3, determining a phase difference fine adjustment amount; and S4, obtaining a closed-loop road network phase difference control scheme. When the optimal phase difference of the intersection of the closed-loop road network is determined, firstly, on the basis of actual traffic parameters of the intersection and the closed-loop connecting line, the connecting line road grade, the green wave band width, the saturation degree and the traffic volume are selected as evaluation factors, and |
---|