Air duct construction method using existing transverse channel at end of station as side pilot tunnel

The invention belongs to the technical field of tunnel construction, and particularly relates to an air duct construction method using an existing transverse channel at the end of a station as a side pilot tunnel, which comprises the following steps of: respectively constructing side piles in the si...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XIA RUIJUN, BAO HONGSHENG, KONG HENG, SU XING, WANG TONG, ZHAI YILONG, HE FANGYUAN, SU WEISONG, LI ZHAOPING, WANG QUANXIAN, REN JUNXIN, YU KAI, WANG YUSHU, ZUO JIANZHOU, JIANG WEI, GE YINZE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention belongs to the technical field of tunnel construction, and particularly relates to an air duct construction method using an existing transverse channel at the end of a station as a side pilot tunnel, which comprises the following steps of: respectively constructing side piles in the side pilot tunnel and the transverse channel, constructing middle piles in a middle pilot tunnel, pouring transverse channel and side pilot tunnel pile top beams and primary supports in the pilot tunnels; after construction of side piles in the transverse channel is completed, plain soil and plain concrete are used for backfilling the existing transverse channel from bottom to top in a layered mode and are tamped, an arch waterproof layer is laid in a middle pilot tunnel, and a top longitudinal beam is constructed; the space between the top longitudinal beam and the middle pilot tunnel is backfilled with C20 plain concrete, and interlayer soil between the two pilot tunnels is reinforced through grouting; the existing