Test data management and control method based on business data construction
The invention relates to a test data management and control method based on business data construction. The method comprises the following steps: establishing a business basic data structure model; establishing a business basic test data link model; generating native test data according to the test...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN LIANGPING LI XIAFEI NI JIALE CHEN JIA |
description | The invention relates to a test data management and control method based on business data construction. The method comprises the following steps: establishing a business basic data structure model; establishing a business basic test data link model; generating native test data according to the test data generation service; based on the native test data, key fields are set to recognize sensitive information; non-native test data declaration and declaration auditing; actual test data application management and control, sensitive information identification, native verification and non-native verification are carried out on the actual test data in sequence, and test data passing verification and test data not passing verification are determined; and based on the business basic test data link model, carrying out full-link tracing and destruction on the test data which does not pass the verification. Compared with the prior art, the sensitivity-related test data can be actively and accurately identified, and the se |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN115545891A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN115545891A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN115545891A3</originalsourceid><addsrcrecordid>eNqNyzEKwkAQRuFtLES9w3gAi0UXtJSgCIJV-jDZ_TWB7GzITO6voAewes33lu5eQ40SG1Nm4RcyxIglUSxiUxkow7qSqGVFoiLUztoLVL_TR6lNc7S-yNotnjwoNr-u3PZ6qavbDmNpoCNHCKypHt6HcAjHkz_v_zFvXC81mQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Test data management and control method based on business data construction</title><source>esp@cenet</source><creator>SUN LIANGPING ; LI XIAFEI ; NI JIALE ; CHEN JIA</creator><creatorcontrib>SUN LIANGPING ; LI XIAFEI ; NI JIALE ; CHEN JIA</creatorcontrib><description>The invention relates to a test data management and control method based on business data construction. The method comprises the following steps: establishing a business basic data structure model; establishing a business basic test data link model; generating native test data according to the test data generation service; based on the native test data, key fields are set to recognize sensitive information; non-native test data declaration and declaration auditing; actual test data application management and control, sensitive information identification, native verification and non-native verification are carried out on the actual test data in sequence, and test data passing verification and test data not passing verification are determined; and based on the business basic test data link model, carrying out full-link tracing and destruction on the test data which does not pass the verification. Compared with the prior art, the sensitivity-related test data can be actively and accurately identified, and the se</description><language>chi ; eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221230&DB=EPODOC&CC=CN&NR=115545891A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221230&DB=EPODOC&CC=CN&NR=115545891A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN LIANGPING</creatorcontrib><creatorcontrib>LI XIAFEI</creatorcontrib><creatorcontrib>NI JIALE</creatorcontrib><creatorcontrib>CHEN JIA</creatorcontrib><title>Test data management and control method based on business data construction</title><description>The invention relates to a test data management and control method based on business data construction. The method comprises the following steps: establishing a business basic data structure model; establishing a business basic test data link model; generating native test data according to the test data generation service; based on the native test data, key fields are set to recognize sensitive information; non-native test data declaration and declaration auditing; actual test data application management and control, sensitive information identification, native verification and non-native verification are carried out on the actual test data in sequence, and test data passing verification and test data not passing verification are determined; and based on the business basic test data link model, carrying out full-link tracing and destruction on the test data which does not pass the verification. Compared with the prior art, the sensitivity-related test data can be actively and accurately identified, and the se</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyzEKwkAQRuFtLES9w3gAi0UXtJSgCIJV-jDZ_TWB7GzITO6voAewes33lu5eQ40SG1Nm4RcyxIglUSxiUxkow7qSqGVFoiLUztoLVL_TR6lNc7S-yNotnjwoNr-u3PZ6qavbDmNpoCNHCKypHt6HcAjHkz_v_zFvXC81mQ</recordid><startdate>20221230</startdate><enddate>20221230</enddate><creator>SUN LIANGPING</creator><creator>LI XIAFEI</creator><creator>NI JIALE</creator><creator>CHEN JIA</creator><scope>EVB</scope></search><sort><creationdate>20221230</creationdate><title>Test data management and control method based on business data construction</title><author>SUN LIANGPING ; LI XIAFEI ; NI JIALE ; CHEN JIA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN115545891A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN LIANGPING</creatorcontrib><creatorcontrib>LI XIAFEI</creatorcontrib><creatorcontrib>NI JIALE</creatorcontrib><creatorcontrib>CHEN JIA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN LIANGPING</au><au>LI XIAFEI</au><au>NI JIALE</au><au>CHEN JIA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Test data management and control method based on business data construction</title><date>2022-12-30</date><risdate>2022</risdate><abstract>The invention relates to a test data management and control method based on business data construction. The method comprises the following steps: establishing a business basic data structure model; establishing a business basic test data link model; generating native test data according to the test data generation service; based on the native test data, key fields are set to recognize sensitive information; non-native test data declaration and declaration auditing; actual test data application management and control, sensitive information identification, native verification and non-native verification are carried out on the actual test data in sequence, and test data passing verification and test data not passing verification are determined; and based on the business basic test data link model, carrying out full-link tracing and destruction on the test data which does not pass the verification. Compared with the prior art, the sensitivity-related test data can be actively and accurately identified, and the se</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN115545891A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Test data management and control method based on business data construction |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T14%3A14%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20LIANGPING&rft.date=2022-12-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN115545891A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |