Pier column construction method
The invention relates to the field of civil engineering, and discloses a pier column construction method which comprises the processes of steel bar binding installation, formwork installation, concrete pouring, formwork dismantling and maintenance, concrete scabbling and maintenance and the like, st...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the field of civil engineering, and discloses a pier column construction method which comprises the processes of steel bar binding installation, formwork installation, concrete pouring, formwork dismantling and maintenance, concrete scabbling and maintenance and the like, steel bars are bound to form a steel bar framework, then the steel bar framework is installed at the position where a pier column is located, and a formwork is installed on the periphery of the steel bar framework; and concrete is poured into the formwork, the formwork is removed after the concrete is solidified, and finally chiseling and curing are conducted. The method has the beneficial effects that the pier column machined through the method is good in surface quality and high in strength, the bridge deck can be better borne, and the construction time is short.
本发明涉及土木工程领域,公开了一种墩柱施工方法,该方法包括钢筋绑扎安装、模板安装、混凝土浇筑、模板拆除及养护和混凝土凿毛及养护等过程,将钢筋绑扎成型为钢筋骨架后安装在墩柱所在的位置,并在钢筋骨架外周安装模板,将混凝土浇筑进入模板中,待混凝土凝固后拆除模板,最后进行凿毛和养护。本发明的有益效果为:使用上述方法 |
---|