Safety risk assessment method for large-diameter water supply pipeline settlement caused by shield tunneling
The invention belongs to the technical field of shield construction, and provides a safety risk assessment method for settlement of an underground large-diameter water supply pipeline caused by shield tunneling, and the method comprises the steps: dividing the settlement safety risk levels of the un...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention belongs to the technical field of shield construction, and provides a safety risk assessment method for settlement of an underground large-diameter water supply pipeline caused by shield tunneling, and the method comprises the steps: dividing the settlement safety risk levels of the underground large-diameter water supply pipeline; geological survey is conducted on the underground large-diameter water supply pipeline, and the shield construction soil body loss rate is obtained according to survey parameters; tunneling parameters of the shield penetrating through the underground large-diameter water supply pipeline are designed; performing construction simulation on the shield under-crossing underground large-diameter water supply pipeline, and determining a pipeline predicted settlement value; and according to the predicted settlement value of the pipeline, determining safety risk levels at different positions of the pipeline, and taking corresponding protection measures according to the corresp |
---|