Containment barrel construction method and containment construction method

The invention relates to a containment vessel barrel body construction method and a containment vessel construction method, and the method comprises the following steps: segmenting a barrel body in advance according to the weight of each circle of arc plate of the barrel body and the weight of a cor...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG ZHIKAI, CHU GUIQING, LI HUI, LIU BING, WANG RUI, WEI NA, CHU ZHENG, YIN QINGBIN, WANG DONGSHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a containment vessel barrel body construction method and a containment vessel construction method, and the method comprises the following steps: segmenting a barrel body in advance according to the weight of each circle of arc plate of the barrel body and the weight of a corresponding additional object, so that the sum of the weight of each section of the barrel body and the weight of an additional facility is not greater than the rated hoisting of hoisting equipment; the arc plates of all the sections of the barrel are assembled according to the sections of the barrel, and then corresponding additional facilities are installed; according to the construction method, the multiple sections of the barrel are sequentially hoisted from bottom to top through hoisting equipment till hoisting construction of the whole barrel is completed, and by means of the construction method, the hoisting capacity of the hoisting equipment is matched, and the purpose of assembling and installing additional