Steel-concrete hybrid beam continuous rigid frame bridge suspension casting and hoisting construction method
The invention discloses a steel-concrete hybrid beam continuous rigid frame bridge suspension casting and hoisting construction method which comprises the steps that a sliding way is built on the top face of a T-shaped beam foundation section, and a formwork system of integrated equipment is suspend...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a steel-concrete hybrid beam continuous rigid frame bridge suspension casting and hoisting construction method which comprises the steps that a sliding way is built on the top face of a T-shaped beam foundation section, and a formwork system of integrated equipment is suspended on the side portion of the T-shaped beam foundation section through a suspension hoisting system; a formwork system is in place on the side portion of the foundation section of the T-shaped structure beam, section beam steel bars are bound, and concrete is poured; the main truss slides forwards by the length of one section and is in place; the follow-up section beam is circularly constructed to the previous section of the rigid-concrete combined section; the steel structure of the steel-concrete combined section is transported to a bridge through water, and then the steel structure of the steel-concrete combined section is lifted to the designed elevation and positioned through a hoisting system of the integrate |
---|