Construction method of cement-stabilized solid waste aggregate base layer

The invention relates to the technical field of solid waste aggregate base layer construction, and discloses a cement-stabilized solid waste aggregate base layer construction method which specifically comprises the following steps: step 1, accumulated water, topsoil and the like on a working surface...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG PENG, HUANG JINGRUN, FAN LULU, YIN JIANHUI, LAI SHAOXIONG, ZHANG XIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of solid waste aggregate base layer construction, and discloses a cement-stabilized solid waste aggregate base layer construction method which specifically comprises the following steps: step 1, accumulated water, topsoil and the like on a working surface are cleaned up, and meanwhile, measures such as watering are taken to ensure that the working surface is wet; step 2, performing survey lofting work before paving, calculating a loose paving coefficient, performing marking, and meanwhile, setting up a bracket for controlling a wire; the number of stock bins of a mixing building is matched with the number of material preparation grades, the number of loaders meets the requirement for feeding of the stock bins, and all the bins of the mixing building are sufficient in aggregate and coordinated in number. The method has the beneficial effects that the number of step flows is small, the construction period can be effectively shortened, and the construction cost is red