Steel-concrete composite beam cable-stayed bridge panel construction process capable of reducing cracks

The invention relates to a steel-concrete composite beam cable-stayed bridge panel construction technology capable of reducing cracks. The construction technology comprises the following steps that S1, a surface treating agent is sprayed on the surface of orthotropic steel; s2, orthotropic steel is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG XU, ZHANG GUONING, XING HAO, WANG ZHENLU, WAN ZHENKUN, YAN NING, LEI YONGJUN, CHEN XIANMIN, LIU BENLI, XU GUANHU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a steel-concrete composite beam cable-stayed bridge panel construction technology capable of reducing cracks. The construction technology comprises the following steps that S1, a surface treating agent is sprayed on the surface of orthotropic steel; s2, orthotropic steel is installed, and a bridge floor is cleaned and accepted; s3, measuring and setting out; s4, shear nails are installed, and steel bars are bound; s5, spraying a surface treating agent on the reinforcing steel bars; s6, hot steam spraying and concrete pouring are conducted, and hot steam spraying does not exceed 10 min before concrete pouring; and S7, surface finishing and maintenance. The method has the effect of reducing the cracking probability of the orthotropic steel-concrete combined bridge deck slab. 本申请涉及一种减少开裂的钢混组合梁斜拉桥面板施工工艺,施工工艺包括以下步骤:S1、正交异性钢表面喷涂表面处理剂;S2、正交异性钢安装,桥面清理及验收;S3、测量放样;S4、剪力钉安装,钢筋绑接;S5、钢筋喷涂表面处理剂;S6、热蒸汽喷洒,混凝土浇筑,热蒸汽喷洒不超过混凝土浇筑前10min;S7、收面及养护。本申请具有减小正交异性钢-混凝土组合桥面板开裂概率的效果。