Power grid dispatching operation optimization method and system considering supply-demand double-side uncertainty
The invention relates to a power grid dispatching operation optimization method and system considering supply-demand double-side uncertainty, and the method is characterized in that the method comprises the steps: obtaining the actual data of a supply end and a demand end in a to-be-tested regional...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a power grid dispatching operation optimization method and system considering supply-demand double-side uncertainty, and the method is characterized in that the method comprises the steps: obtaining the actual data of a supply end and a demand end in a to-be-tested regional power grid; the obtained actual data are input into the constructed power grid dispatching operation optimization model considering the uncertainty of the supply side and the demand side, the optimal output load values of the supply side and the demand side in different time periods are obtained, the power grid dispatching operation optimal strategy of the to-be-tested area is formed, and the method can be widely applied to the technical field of power system operation optimization.
本发明涉及一种考虑供需双侧不确定性的电网调度运行优化方法及系统,其特征在于,包括:获取待测区域电网中供给端和需求端的实际数据;将获取的实际数据输入至构建的考虑供需双侧不确定性的电网调度运行优化模型中,得到不同时段下供给端和需求端的最优出力负荷值,形成待测区域电网调度运行最优策略,本发明可以广泛应用于电力系统运行优化技术领域中。 |
---|