Water level delay factor-based drainage basin water level delay influence time prediction model
The invention provides a drainage basin water level delay influence time prediction model based on a water level delay factor, which is established by calculating the water level delay influence time of an upstream water level or flood discharge measured by an upstream measuring point on a downstrea...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a drainage basin water level delay influence time prediction model based on a water level delay factor, which is established by calculating the water level delay influence time of an upstream water level or flood discharge measured by an upstream measuring point on a downstream measuring point based on historical water level data. The model performs real-time fitting on the calculated water level delay influence time based on upstream and downstream water levels, wind speed and rainfall factors so as to improve the accuracy of a drainage basin monitoring system; measuring points in the prediction model are arranged at a main stream, a branch stream, a dam or a sluice of the drainage basin, and the upstream measuring points and the downstream measuring points are directly associated on the hydrological space structure of the drainage basin; the factors influencing the water level of the downstream measuring point are historical water level, rainfall and flood discharge at the upstream me |
---|