Scheduling control method of battery swap station participating in collaborative multi-scene application
The invention discloses a dispatching control method for a battery swap station participating in collaborative multi-scene application, and the method comprises the steps: S1, obtaining a battery swap station battery swap demand prediction curve and a battery swap station electric quantity trend pre...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a dispatching control method for a battery swap station participating in collaborative multi-scene application, and the method comprises the steps: S1, obtaining a battery swap station battery swap demand prediction curve and a battery swap station electric quantity trend prediction curve of the current day through a prediction algorithm according to a real-time battery swap demand curve and other information data of the battery swap station of the previous day; s2, according to the curve characteristic information including the slope, the duration, the maximum electric quantity demand and the minimum electric quantity demand of the battery swap station battery swap demand prediction curve and the battery swap station electric quantity trend prediction curve, battery swap power flow time positioning is completed, and the previous period of time of the battery swap power flow time period is defined as the battery swap electric quantity holding time; s3, determining the allowable fluctua |
---|