Temporary restraining structure and method for tower beam of spatial four-tower-limb cable bent tower

The invention relates to the technical field of temporary constraint of bridges, in particular to a temporary constraint structure and method for tower beams of a spatial four-tower-limb cable bent tower. Steel beam longitudinal brackets are located on the two transverse sides of a steel beam and lo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU JINZHU, WU XIAODONG, HUANG GANLE, DONG JIAN, ZHENG JIANXIN, LI JIE, CHEN JIANRONG, HUANG CAN, LIU YANG, HU QINXIA, LI YONGHUI, KANG XUEYUN, GAO HONGLEI, YUAN CAN, MU WENJUN, ZHU HAO, SUN NANCHANG, WANG CHAO, LYU XINRUI, CHEN YANSONG, SHEN LI, LYU DANFENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of temporary constraint of bridges, in particular to a temporary constraint structure and method for tower beams of a spatial four-tower-limb cable bent tower. Steel beam longitudinal brackets are located on the two transverse sides of a steel beam and located between tower limbs on the two longitudinal sides. The longitudinal temporary constraint structure is arranged between a longitudinal bracket of the steel beam and a longitudinal adjacent tower limb and is used for carrying out longitudinal temporary constraint on the steel beam and the tower limb; the transverse temporary restraining structures are arranged between the steel beams and the adjacent tower limbs on the two transverse sides and used for conducting transverse temporary restraining on the steel beams and the tower limbs. The vertical temporary restraining structure is arranged between the steel beam and the side span cross beam between the two tower limbs on the side span side and between the midd