Side wall protection mechanism for mine extremely-high draw shaft construction and using method of side wall protection mechanism

The invention discloses a side wall protection mechanism for mine extremely-high draw shaft construction and a using method of the side wall protection mechanism, and relates to the technical field of extremely-high draw shafts. The side wall protection mechanism for mine extremely-high draw shaft c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LAI ZHONGSHAN, ZHOU LIN, WANG YUFU, LIU ZHIYONG, TIAN QIZHI, TAO LEI, WANG QI, XI TINGTANG, XIE BINGXIANG, ZHANG QIANG, WANG NANNAN, WEN ZHENGFA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a side wall protection mechanism for mine extremely-high draw shaft construction and a using method of the side wall protection mechanism, and relates to the technical field of extremely-high draw shafts. The side wall protection mechanism for mine extremely-high draw shaft construction comprises an embedded concrete block, the top of the embedded concrete block is fixedly connected with a control mechanism through a connecting rod, and a loudspeaker is arranged at the top of the control mechanism. According to the side wall protection mechanism for mine extremely-high draw shaft construction and the using method thereof, the independent adjusting and detecting mechanism is arranged, so that the protection mechanism can adjust the position and orientation of the protection mechanism according to the acting force, the service life of the protection mechanism is prolonged, and meanwhile the overhaul frequency is reduced. 本发明公开了一种矿山极高溜井施工用侧壁防护机构及其使用方法,涉及极高溜井技术领域。该矿山极高溜井施工用侧壁防护机构,包括埋设混凝土块,