Hydropower station in-plant economic optimization method based on comprehensive benefits

The invention discloses a comprehensive benefit-based in-plant economic optimization method for a hydropower station. The method comprises the following steps of S1, solving a target function; s2, setting constraint conditions; according to the method, big data statistical parameters and unit online...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHI HAILONG, BAI WEI, YAN YINGFENG, GU FAYING, JIANG MIN, PENG FANG, XIANG WENPING, SONG KE, QIU HUA, WANG LENING, FENG XUN, ZHONG QINGXIANG, GONG CHUANLI, TAN JUN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a comprehensive benefit-based in-plant economic optimization method for a hydropower station. The method comprises the following steps of S1, solving a target function; s2, setting constraint conditions; according to the method, big data statistical parameters and unit online monitoring data are incorporated, threshold parameters such as a unit stable working condition range and a unit efficient operation range are formed, and two new optimization dimensions of unit stability and unit adjustment efficiency are increased. 本发明公开了一种基于综合效益的水电站厂内经济优化方法,包括以下步骤:S1:求解目标函数;S2:设定约束条件;本发明纳入大数据统计参数、机组在线监测数据,形成机组稳定工况范围、机组高效运行范围等阈值参数,增加机组稳定性和机组调节效能这两种新的优化维度。