Construction structure system and construction method of large pre-deviator main cable saddle

The invention relates to a construction structure system and a construction method of a large pre-deviation main cable saddle, the construction structure system comprises a main tower, the top surface of the main tower is provided with a first avoiding groove, the first avoiding groove extends to th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FU ZHANGONG, PAN TAO, HE DONGSHENG, XIAO HAIZHU, QIU YUANXI, ZHANG JINTAO, YI LIBANG, FU LANLAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a construction structure system and a construction method of a large pre-deviation main cable saddle, the construction structure system comprises a main tower, the top surface of the main tower is provided with a first avoiding groove, the first avoiding groove extends to the edge of one side of the main tower, and a first opening is formed in the vertical side wall of the side; the permanent base is fixedly arranged in the central area of the top surface of the main tower, a second avoiding groove is formed in the permanent base and corresponds to the first avoiding groove, and the second avoiding groove vertically communicates with the first avoiding groove; the temporary base is fixedly arranged on the top surface of the main tower, a shear connecting piece for connecting the bottom surface of the temporary base with the main tower is arranged between the bottom surface and the main tower, and a first construction joint is reserved; the counter-force base is fixedly connected to th