Thermal power plant safety monitoring system based on 5G technology

The embodiment of the invention provides a thermal power plant safety monitoring system based on a 5G technology, and the system obtains a problem time-space domain trajectory, a non-problem time-space domain trajectory and a trajectory vector of the non-problem time-space domain trajectory of an un...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CUI LEI, SUN TONGMIN, ZHANG YUE, WU XINGZHUO, YANG RUYI, SUN BAOHONG, HANG YONG, HE YANFENG, HAO WEI, WANG XIANWEN, ZHANG ZHI, GAO HAIJUN, ZHANG HUILI, YANG YUAN, YANG JIE, SONG ZEYI, CUI GUIPING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The embodiment of the invention provides a thermal power plant safety monitoring system based on a 5G technology, and the system obtains a problem time-space domain trajectory, a non-problem time-space domain trajectory and a trajectory vector of the non-problem time-space domain trajectory of an undetermined safety problem based on a safety problem decision network, and carries out the positioning of the problem time-space domain trajectory according to the coverage partition of the problem time-space domain trajectory. According to the method, the target trajectory vector associated with the target trajectory vector is obtained, and whether the problem type of the problem time-space domain trajectory is the emergency monitoring type is determined based on the trajectory partition corresponding to the target trajectory vector and the shared feature number of the problem time-space domain trajectory, so that the reliability of safety monitoring is improved. 本发明实施例提供一种基于5G技术的火电厂安全监控系统,基于安全问题决策网络,得到待定安全问题的问题时空域