Foundation reinforcement construction method in bridge operation period
The invention provides a foundation reinforcement construction method during bridge operation, which comprises the following steps: S1, detecting a pier pile foundation, and issuing a detection report; s2, a temporary support system is erected on the bridge according to the detection report; s3, rei...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a foundation reinforcement construction method during bridge operation, which comprises the following steps: S1, detecting a pier pile foundation, and issuing a detection report; s2, a temporary support system is erected on the bridge according to the detection report; s3, reinforcing pile foundation construction; and S4, reinforcing bearing platform construction. On one hand, traffic does not need to be paused or closed, and normal traffic operation of the bridge is ensured; and on the premise of ensuring the construction safety, the bridge foundation reinforcement construction difficulty is reduced, and the construction quality and progress are ensured.
本发明提供一种桥梁运营期间的基础加固施工方法,包括以下步骤:S1,对桥墩桩基进行检测,并出具检测报告;S2,依托检测报告对桥梁进行临时支架体系搭设;S3,加固桩基施工;S4,加固承台施工。本发明一方面无须暂停或关闭交通,确保桥梁正常通行运营;二方面则可在保证施工安全的前提下,降低桥梁基础加固施工难度,保障施工质量和进度。 |
---|