Water conservancy project cofferdam sub-weir and construction method thereof
The invention provides a hydraulic engineering cofferdam sub-weir and a construction method thereof. The hydraulic engineering cofferdam sub-weir comprises a cofferdam body and a heightened sub-weir, the cofferdam body comprises an earth-rock weir and a concrete panel, and the concrete panel is fixe...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a hydraulic engineering cofferdam sub-weir and a construction method thereof. The hydraulic engineering cofferdam sub-weir comprises a cofferdam body and a heightened sub-weir, the cofferdam body comprises an earth-rock weir and a concrete panel, and the concrete panel is fixedly arranged on the outer surface of one side of the earth-rock weir; the heightened sub-weir comprises membrane cloth, filling soil, color strip cloth, two sets of canvas bags, capping soil, a plurality of reinforcing steel bars, a plurality of filling sand, a hollow elastic pipe support and hydrogel, the cofferdam sub-weir is structurally optimized by actually measuring water level flow data, and the water level flow data of multiple floods of a water conservancy project and multi-year hydrological observation data of a river channel are actually measured, so that the cofferdam sub-weir is constructed. Related engineering design is optimized to achieve the purpose of saving the manufacturing cost, and meanwhile t |
---|