Full-section deep hole grouting reinforcement method
The invention relates to a full-section deep hole grouting reinforcement method, which belongs to the field of tunnel underground excavation reinforcement methods, and mainly comprises the following steps: S1, excavating an end wall of a tunnel underground hole opening; s2, a pipe shed supporting st...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a full-section deep hole grouting reinforcement method, which belongs to the field of tunnel underground excavation reinforcement methods, and mainly comprises the following steps: S1, excavating an end wall of a tunnel underground hole opening; s2, a pipe shed supporting structure is arranged at the excavation contour line of the tunnel portal; and S3, a first section deep hole grouting area is arranged below the pipe shed supporting structure, a second section deep hole grouting area is arranged on the periphery of the pipe shed supporting structure, and deep hole grouting is conducted on the first section deep hole grouting area and the second section deep hole grouting area. Wherein the grouting mode is that one hole is formed and one hole is injected, and the hole forming and grouting processes in the same area are circularly carried out between the circumferential grouting holes of the adjacent circles. The full-section deep hole grouting reinforcement method has the advantages |
---|