Construction method of bridge girder erection machine

The invention provides a construction method of a bridge girder erection machine. The construction method comprises the steps that the bridge girder erection machine carries out pile installation operation at a pile installation position; the bridge girder erection machine hoists a cover beam to a c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU ZHIFENG, SHEN CHAO, LIAO JIANG, HE LI, DENG WENHAO, LIN WENPIAO, SU NIANJIU, LIU HONGBO, HU XUDONG, LI ZHENXI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a construction method of a bridge girder erection machine. The construction method comprises the steps that the bridge girder erection machine carries out pile installation operation at a pile installation position; the bridge girder erection machine hoists a cover beam to a cover beam erection position for cover beam erection operation, and the cover beam is transported to the position where the bridge girder erection machine is located by a transport vehicle; the bridge girder erection machine hoists a main girder to a main girder erection position to perform main girder erection operation, and the main girder is transported to the position where the bridge girder erection machine is located by a transport vehicle. According to the construction method of the bridge girder erection machine, the bridge girder erection operation is carried out, the construction process of the bridge girder erection operation of the bridge girder erection machine is simplified, and the construction method