Rainwater recharge process for protecting subway structure in complex karst cave area

The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HUANG YUN, LIU XIANNAN, HUANG QIUTENG, HE ZHAOWEN, LUO YAN, CHEN GAOFENG, MENG XIAOLIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HUANG YUN
LIU XIANNAN
HUANG QIUTENG
HE ZHAOWEN
LUO YAN
CHEN GAOFENG
MENG XIAOLIAN
description The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arranged; arranging a recharge well, a water level monitoring well and a water collection and supply precipitation system, wherein the drainage ditch and the recharge well are communicated with the water collection and supply precipitation system; according to the dewatering and recharging process system, water in a dewatering well is pumped and drained to a drainage ditch, water in the drainage ditch is pumped and drained to a water collection and supply precipitation system, the water level is monitored, and when the water level of the periphery of the subway structure declines by 2 m, water is pumped into a recharging well from the water collection and supply precipitation system till the water level recovers to th
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN114351739A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN114351739A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN114351739A3</originalsourceid><addsrcrecordid>eNqNyjEKwkAQRuE0FqLeYTyARYgilhIUKwvROozDnxiMu8vMxOjtRfAAVu8r3ji7nLgNAzuUFHJjbUBJo8CM6qhfO8Tb0JD114HfZK69eK-gNpDER-rwojurOQk_QazgaTaquTPMfp1k8_3uXB4WSLGCJRYEeFUe83xZrPJ1sdkW_zwfN2o5yw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Rainwater recharge process for protecting subway structure in complex karst cave area</title><source>esp@cenet</source><creator>HUANG YUN ; LIU XIANNAN ; HUANG QIUTENG ; HE ZHAOWEN ; LUO YAN ; CHEN GAOFENG ; MENG XIAOLIAN</creator><creatorcontrib>HUANG YUN ; LIU XIANNAN ; HUANG QIUTENG ; HE ZHAOWEN ; LUO YAN ; CHEN GAOFENG ; MENG XIAOLIAN</creatorcontrib><description>The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arranged; arranging a recharge well, a water level monitoring well and a water collection and supply precipitation system, wherein the drainage ditch and the recharge well are communicated with the water collection and supply precipitation system; according to the dewatering and recharging process system, water in a dewatering well is pumped and drained to a drainage ditch, water in the drainage ditch is pumped and drained to a water collection and supply precipitation system, the water level is monitored, and when the water level of the periphery of the subway structure declines by 2 m, water is pumped into a recharging well from the water collection and supply precipitation system till the water level recovers to th</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220415&amp;DB=EPODOC&amp;CC=CN&amp;NR=114351739A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25566,76549</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220415&amp;DB=EPODOC&amp;CC=CN&amp;NR=114351739A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HUANG YUN</creatorcontrib><creatorcontrib>LIU XIANNAN</creatorcontrib><creatorcontrib>HUANG QIUTENG</creatorcontrib><creatorcontrib>HE ZHAOWEN</creatorcontrib><creatorcontrib>LUO YAN</creatorcontrib><creatorcontrib>CHEN GAOFENG</creatorcontrib><creatorcontrib>MENG XIAOLIAN</creatorcontrib><title>Rainwater recharge process for protecting subway structure in complex karst cave area</title><description>The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arranged; arranging a recharge well, a water level monitoring well and a water collection and supply precipitation system, wherein the drainage ditch and the recharge well are communicated with the water collection and supply precipitation system; according to the dewatering and recharging process system, water in a dewatering well is pumped and drained to a drainage ditch, water in the drainage ditch is pumped and drained to a water collection and supply precipitation system, the water level is monitored, and when the water level of the periphery of the subway structure declines by 2 m, water is pumped into a recharging well from the water collection and supply precipitation system till the water level recovers to th</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwkAQRuE0FqLeYTyARYgilhIUKwvROozDnxiMu8vMxOjtRfAAVu8r3ji7nLgNAzuUFHJjbUBJo8CM6qhfO8Tb0JD114HfZK69eK-gNpDER-rwojurOQk_QazgaTaquTPMfp1k8_3uXB4WSLGCJRYEeFUe83xZrPJ1sdkW_zwfN2o5yw</recordid><startdate>20220415</startdate><enddate>20220415</enddate><creator>HUANG YUN</creator><creator>LIU XIANNAN</creator><creator>HUANG QIUTENG</creator><creator>HE ZHAOWEN</creator><creator>LUO YAN</creator><creator>CHEN GAOFENG</creator><creator>MENG XIAOLIAN</creator><scope>EVB</scope></search><sort><creationdate>20220415</creationdate><title>Rainwater recharge process for protecting subway structure in complex karst cave area</title><author>HUANG YUN ; LIU XIANNAN ; HUANG QIUTENG ; HE ZHAOWEN ; LUO YAN ; CHEN GAOFENG ; MENG XIAOLIAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN114351739A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>HUANG YUN</creatorcontrib><creatorcontrib>LIU XIANNAN</creatorcontrib><creatorcontrib>HUANG QIUTENG</creatorcontrib><creatorcontrib>HE ZHAOWEN</creatorcontrib><creatorcontrib>LUO YAN</creatorcontrib><creatorcontrib>CHEN GAOFENG</creatorcontrib><creatorcontrib>MENG XIAOLIAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HUANG YUN</au><au>LIU XIANNAN</au><au>HUANG QIUTENG</au><au>HE ZHAOWEN</au><au>LUO YAN</au><au>CHEN GAOFENG</au><au>MENG XIAOLIAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Rainwater recharge process for protecting subway structure in complex karst cave area</title><date>2022-04-15</date><risdate>2022</risdate><abstract>The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arranged; arranging a recharge well, a water level monitoring well and a water collection and supply precipitation system, wherein the drainage ditch and the recharge well are communicated with the water collection and supply precipitation system; according to the dewatering and recharging process system, water in a dewatering well is pumped and drained to a drainage ditch, water in the drainage ditch is pumped and drained to a water collection and supply precipitation system, the water level is monitored, and when the water level of the periphery of the subway structure declines by 2 m, water is pumped into a recharging well from the water collection and supply precipitation system till the water level recovers to th</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN114351739A
source esp@cenet
subjects CESSPOOLS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SEWERAGE
SEWERS
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
WATER SUPPLY
title Rainwater recharge process for protecting subway structure in complex karst cave area
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T17%3A49%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HUANG%20YUN&rft.date=2022-04-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN114351739A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true