Rainwater recharge process for protecting subway structure in complex karst cave area
The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arr...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a dewatering and recharging process for protecting a subway structure in a complex karst cave area. The dewatering and recharging process comprises the following steps that underground water level observation holes are formed, and dewatering wells and drainage ditches are arranged; arranging a recharge well, a water level monitoring well and a water collection and supply precipitation system, wherein the drainage ditch and the recharge well are communicated with the water collection and supply precipitation system; according to the dewatering and recharging process system, water in a dewatering well is pumped and drained to a drainage ditch, water in the drainage ditch is pumped and drained to a water collection and supply precipitation system, the water level is monitored, and when the water level of the periphery of the subway structure declines by 2 m, water is pumped into a recharging well from the water collection and supply precipitation system till the water level recovers to th |
---|