Pre-splitting method for tunneling construction
The invention discloses a presplitting method for tunneling construction. The presplitting method comprises the following steps: step 1, presplitting an upper area of a tunnel: distributing and drilling holes in the upper area of the tunnel; pre-splitting flat holes and crushing and discharging slag...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a presplitting method for tunneling construction. The presplitting method comprises the following steps: step 1, presplitting an upper area of a tunnel: distributing and drilling holes in the upper area of the tunnel; pre-splitting flat holes and crushing and discharging slag; 2, pre-splitting the lower area of the tunnel, wherein holes are distributed and drilled in the two sides of the lower area of the tunnel; pre-splitting the vertical hole, crushing and discharging slag; pre-splitting flat holes and crushing and discharging slag; step 3, pre-splitting an inverted arch area: pre-splitting a vertical hole; and crushing and discharging slag. According to the pre-splitting method used in the tunneling construction, a flat hole pre-splitting method and a vertical hole pre-splitting method are combined for use, the excavation contour line is accurately controlled, back break is effectively prevented, and the tunnel excavation and tunneling construction progress is remarkably improved; t |
---|