Excavation design construction method for four-arch tunnel
The invention discloses an excavation design construction method for a four-arch tunnel. The excavation design construction method comprises the steps that S101, a middle pilot tunnel is excavated, and a corresponding middle partition wall is constructed; s102, an upper step of the right main hole a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!